CP - Construction Phase
- CP-0040 Contractor’s Daily Report
- CP-0100 Request for Information
- CP-0120 Cutting and Patching Request
- CP-0170 Payee Data Record Form
- CP-0191 Payment Certification
- CP-0197 Professional Services Invoice
- CP-0254 Notice of Change/Delay
- CP-0270-A and CP-0270-B Change Order Request and COR Estimate
- CP-0271 Labor Wage Rate Calculation
- CP-0272 Time and Material Form
- CP-0351 Inspection Request
- CP-0400 Four-Week Rolling Schedule
- CP-0460 Incident Notification Report
- CP-0480 Design Consultant’s Supplemental Instructions
- CP-0490 Design Consultant’s Field Report
- CP-0530 Shop Drawing and Sample Record
- CP-0540 Project Signage Safety Signage Instructions Package
- CP-0600 Conditional Waiver Release on Progress Payment
- CP-0610 Unconditional Waiver Release on Aggregate Payment
- CP-0620 Conditional Waiver Release on Final Payment
- CP-0630 Unconditional Waiver Release on Final Payment
- CP-0675 Project Inspector (PI) Daily Report
CPS - Construction Phase Safety
- CPS-0010 Hold Harmless Agreement Form
- CPS-0400 A Safety Orientation Contractors Employee Acknowledgment
- CPS-0420 Incident Investigation Report
- CPS-0422 Witness Statement
- CPS-0427 Project Health Safety and Environmental Plan
- CPS-0430 Monthly Project Safety Performance Summary
- CPS-0440 Task Hazard Analysis
- CPS-0460 Incident Notification Report
- CPS-0470 OCIP Declination Form
- CPS-0480 Site-Specific Fall Protection and Prevention Plan
DES - Design Procedures
- DES-0002-B BIM 360 Upload Verification Checklist
- DES-0002-C BIM 360 Upload & Validation Report – CAD (Non-BIM)
- DES-0002-D BIM Asset Data for Design and As-Built Documentation
- DES-0002-E Parameter ID Definitions for the BIM Asset Data
- DES-0002-F BlueBeam Studio Review Procedures
- DES-0003-A1 Project Design Coordination Checklist (XLS)
- DES-0003-A1 Project Design Coordination Checklist (PDF)
- DES-0003-B Constructability Maintainability Check List
- DES-0003-C Project Review Form
- DES-0007-C Energy Modeling Cover Sheet
- DES-0010-A Programming and Schematic Design Estimate
- DES-0010-B Design Development Estimate
- DES-0010-C 50 Percent Construction Document Cost Estimate
- DES-0010-D 100 Percent Construction Document Cost Estimate
PA - Post Award Phase
PLA - Project Labor Agreement
If you don’t see a form you need, contact the appropriate person below for help.
Category | |
PMA – Program Management Administration | Candice.Corcios@build-laccd.org |
DES – Design Procedures | Carey.Demas@build-laccd.org |
PA – Post Award Phase | David.Travers@build-laccd.org |
PLA – Project Labor Agreement | Joseph.Sangalang@build-laccd.org |
CP – Construction Phase | Dolores.Villasenor@build-laccd.org |
CC – Construction Completion | Dolores.Villasenor@build-laccd.org |
CPS – Construction Phase Safety | Steve.Fraser@build-laccd.org |
OR – Outreach Forms | Nicolas.Barrios@build-laccd.org |
ACCT – Accounting | John.VanWhervin@build-laccd.org |